Story of green pammal, Chennai
BIOTECH
- WASTE TO ELECTRICITY PROJECT
(Module digester model )
(Module digester model )
BIOTECH has designed and
installed a compact and pre fabricated Bio waste to Electricity plant at Sri
Sankar Nagar, Pammal, Chennai, the Capital of Tamil Nadu, India . This plant has been
installed in association with Exinora Green Pummal, a well known NGO actively
involved in waste management projects for the last several years. The cost of
the project amounted to Rs. 22 lakhs. The fund for the purpose was raised by
Exinora Green Pummal from different donors.
This plant is capable of
treating 300 Kg. of organic waste every day. Bio methanization technology is
applied for this process. The process involves the breaking down of the waste
substances into simpler substances for the consumption of microorganisms
resulting in the by production of methane and carbon dioxide. 25-30 Cum Biogas is being generated every
day. This gas is utilized for power generation. 40 KWH of electricity is
generated every day. It is used for meeting the in-house requirement for the
project and for street lighting. 50 N0s. of Compact Fluorescent Lamps (CFL)
have been installed nearby the streets and these are working with green
electricity.
The main advantage of the
prefabricated system is the saving of space and time required
for the installation. Without much expense all parts of the plant can be shifted from one place to other if necessary. It is maintenance free and uses only minimum moving parts. The treated solid manure can be removed from the pre-digester. Through the introduction of pre-digesters, there is no chance for formation of scum in the digesters. Predigesting also helps in better performance of the reactor as the physical conditions can be maintained at required. The expected life of the plant is more than15 years. The Environmental benefit derived through the installation of the plant is equivalent to the emission reduction of more than 100 metric tones of CO2 every year. It also solves the problem of waste disposal and the other negative impacts like pollution, diseases, unaesthetic appearance of the city etc related to it.
for the installation. Without much expense all parts of the plant can be shifted from one place to other if necessary. It is maintenance free and uses only minimum moving parts. The treated solid manure can be removed from the pre-digester. Through the introduction of pre-digesters, there is no chance for formation of scum in the digesters. Predigesting also helps in better performance of the reactor as the physical conditions can be maintained at required. The expected life of the plant is more than15 years. The Environmental benefit derived through the installation of the plant is equivalent to the emission reduction of more than 100 metric tones of CO2 every year. It also solves the problem of waste disposal and the other negative impacts like pollution, diseases, unaesthetic appearance of the city etc related to it.
Sri Sankar Nagar, Pammal, Chennai - 75, Tamilnadu state, India
Distance from the Chennai International
Airport – 4 Km.
Project promoted by - Exinora Green Pummal
Main Sponsor- Sam Foundation .
Technical Details of Waste to
Electricity ptoject
Treatment
Capacity of the Plant - 300 Kg. of Organic Waste
Type
of feed materials - All degradable materials like
cooked food waste, vegetable, fruits,fish and meat waste
cooked food waste, vegetable, fruits,fish and meat waste
No.
of Anaerobic Pre-digesters - 3 Nos
Volume
of each Pre-digesters - 3,500 litters
No.
of Digesters - 3 Nos.
Volume
of digesters - 20,000 litters
Gas
generation per day - 25 – 30 Cum
Use
of gas - Electricity Generation
Generator
(100% biogas model) - 5 KW
Stand
by generator (Duel Fuel model) - 3 KW
Organic
fertilizer output per day - Liquid Fertilizer – 300 liter
Solid
Fertilizer – 30 Kg.
Electricity
Generation - 35 KWH
Number
of hours - 7 Hrs. ( Day time 3 Hrs.,
Evening – 6 pm to 10 pm )
Number
of lights installed - 50 Nos. of 11 W CFL
In-house requirement of
electricity -For the operation
of pump in slurry loop system, pump in Gas scrubber, gas pump, de-humidifier
etc.
Manpower required for the
operation of plant- One operator + One
part time supervisor
Annual benefits derived from the project
Hygienic
disposal of organic waste
- 109 Metric Tons
Bio Gas
produced
- 10,950 Cum
Electricity
generated
- 16,425 KWH
Liquid
fertilizer
- 109,500 Litres
Solid
manure
- 10 Metric Tons
Co2 emission
reduction
- 3105 Metric Tons
Employment
generated
- 1450 Man days.
(Including
involvement of waste collectors)
This type of decentralized
waste treatment system helps the community to participate in de centralized
waste disposal, green energy generation , reducing pollution and in climate protection activities also . To
achieve this goal BIOTECH is trying our level best.